Hoffmann Neopac Thun, CH-Thun

A residential neighborhood, including a nursing home, is set to be built on the grounds of the packaging manufacturer Hoffmann-Neopac in the coming years. As the largest building in this part of the city, the 300-meter-long factory building serves as a focal point within the heterogeneous, disintegrating structures of the city’s outskirts.

Image from page “Hoffmann Neopac Thun”
Image from page “Hoffmann Neopac Thun”

While the railroad runs to the west and industrial zones extend to the south, the north and east are characterized by small-scale residential areas that extend all the way to the campground near the lake. The design seeks to harness the site’s history and significance for its future development, treating the existing buildings — in both the first and second phases of the site’s development — as “partners” rather than “opponents” of the development project.

Image from page “Hoffmann Neopac Thun”
Image from page “Hoffmann Neopac Thun”
Image from page “Hoffmann Neopac Thun”

The design therefore integrates all future components (streets, squares, building structures, and civil engineering works) into the site’s coordinate system and leaves some factory buildings standing in the second phase. These fragments serve a practical and atmospheric purpose: on the one hand, they function as noise barriers and a solar power plant; on the other hand, they create points of orientation and identity within the new development by serving as an urban loggia and an industrial garden.

Info

  • Development: 2015 – 2016
  • Client: Hoffmann Neopac AG & Frutiger AG Real Estate Development, Thun, Switzerland
  • Floor Area: 32’000 m²
  • Awards: 3rd place

similar

SKF

Kerenzerberg Sports Center, CH-Filzbach

As part of the Kerenzerberg project competition, the existing complex — which includes summer and winter sports facilities — is to be renovated after more than 40 years and expanded through additional construction projects in various areas. In addition to upcoming renovation work on the existing buildings and playing fields, plans call for the construction of an additional triple-purpose sports hall, a central maintenance facility, a new building to replace the existing lodging facility — which no longer meets current needs — as well as an expansion of the currently too-small recovery area near the indoor pool and the classrooms.