Living on the Aare, CH-Brügg

The lot to be developed for the construction of a new residential building is located directly on the Nidau-Büren Canal, between the road bridge and the railroad bridge in the direction of Bern. The access to the highway and the Brügg train station are in the immediate vicinity. The neighborhood is characterized by its very diverse building fabric, featuring small single-family homes, simple-looking apartment buildings, and public structures such as the elementary school and the Brügg train station building.

Image from page “Living on the Aare”
Image from page “Living on the Aare”

Access to the property is via Neubrückstrasse, which experiences heavy traffic in some sections. The new building clarifies and reinforces the urban context of the street space. With its scale and its north-facing recessed façade, the six-story building establishes a tranquil connection to the building across the street while also providing sound insulation for the private outdoor areas to the south. The design of the building’s volume creates a clear separation between private and public spaces for the outdoor areas of the individual apartments.

Image from page “Living on the Aare”

Toward the south, the building’s volume is stepped, similar to a terraced design. This allows for the arrangement of various apartment types, such as ground-floor apartments with generous ceiling heights and spacious outdoor areas, upper-floor apartments with front terraces designed for through-living, and, on the top floor, some duplex apartments. At the same time, this design optimally addresses the natural light conditions, views, and privacy of each apartment. This clear architectural concept gives the building a distinctive and identity-defining character.

Image from page “Living on the Aare”
Image from page “Living on the Aare”

Info

  • Development: 2018
  • Client: Aarimo AG, Nidau, Switzerland
  • Floor Area: 6’000 m²

similar

AHA

Sorell Hotel Aarauerhof, CH-Aarau

Today’s Hotel Aarauerhof is located on Bahnhofsplatz in Aarau and was built in 1972. Since the building’s infrastructure no longer meets the requirements of a modern hotel operation and the revision of the building and zoning regulations allows for a significantly greater building height for the Aarauerhof site, the owners decided to replace the existing building with a new one.